2007

Arigato Keskus OÜ Rannamõisa tee 3, Tallinn 13516

Assembly of water, heating, and water treatment systems.
Customer: Indrek Pertelson

2008 - 2009

Rocca Al Mare Keskus Tallinn

Assembly of sprinkler systems part 1- part 2, first floor.
Customer: YIT ehitus AS

2009 - 2010

Rohuküla sadam

Installation of water pipelines, pipelines for stormwater and sewerage.
Customer: Inseneeriehitus AS

2010

Soome Turku Lasteaed

Installation of water and sewerage systems.
Customer: Are OY, Algo rakendus OÜ


2010

Soome, Helsinki Unionkatu 20-22 Japanin Suurlänetystö

Assembly of freezing and cooling systems.
Customer: Are OY, Algo rakendus OÜ

2010 - 2011

Soome, Joensuu Pamillonkatu 21a

Assembly of metal structures and heating units.
Customer: Are OY, Algorakendus OÜ

2010 - 2011

AS FARMI Piimatööstus Jõhvi Linda 15

Assembly of water and sewerage systems, assembly of heating systems.
Customer: Ferdmaster OÜ

2011

Eesti, Sillamäe Kesk 2
Installation of industrial pipelines and sea water pipelines ( h49), Repairs of heating pipelines (h530), Installation of air ducts (h51) Injecting pressure, filling and checking the system, Flushing heating systems, disassembly of old valves and assembly of new valves.
Customer: AS Silmet

2011

Soome , Joensuu Pamillonkatu 21a

Assembly of cooling units and pipelines.
Customer: YIT Kiinteteistötekniika OY

2012

Eesti, Sillamäe Viru 21

Design, supply, setting of automatic heating units, 3 sets, part 1.
Customer: KÜ Viru 21

2012

Eesti, Sillamäe Kesk 2

Assembly of sea water and heating pipelines (h49), cooling system (h530).
Customer: AS Molycorp Silmet

2013

Eesti, Sillamäe Viru 21

Design, supply, setting of automatic heating units, 3 sets, part 2.
Customer: KÜ Viru 21


2012

Eesti, Sillamäe Kesk 2

Assembly of sea water and heating pipelines (h49), cooling system (h530).
Customer: AS Molycorp Silmet

2014

Eesti, Narva, Tallinna mnt.41 Astrikeskus
H&M Manufacturing metal structures
Manufacturing and assembly of metal structures 2nd floor. Facade
Assembly of pipelines (cooling) 1-2 floor, insulation works
Manufacturing and assembly of metal structures 2nd floor.
Assembly of storm water pipelines
Manufacturing and assembly of metal structures 3rd floor. Switchboard room.
Customer: Nordecon AS

2014

Eesti, Sillamäe Kesk 2

Renovating metal structures (h49), Renovating industrial pipelines (h51),
assembly of heating pipelines, manufacturing and installation of maintenance platforms (h530).
Customer: AS Molycorp Silme

2015

Eesti, Sillamäe Kesk 2

ESKAR 9,6 (h530) assembly works part 1
Building 530 Assembly of industrial pipelines
Building 53 Assembly of metal structures, assembly of industrial pipelines.
Customer: AS Molycorp Silmet


2016

Eesti, Sillamäe Kesk 2

Building 64 Assembly of industrial pipelines, Assembly of metal structures.
Building 53 Assembly of industrial pipelines, Assembly of metal structures.
Building 49 Assembly of industrial pipelines.
Customer: AS Molycorp Silmet